Answer
How long does a garden design and build take?
Design is usually a few weeks; the build runs from weeks to several months by scale.
In short
The design phase is usually a few weeks, depending on the complexity and the survey. The build then runs from a couple of weeks for a focused project to several months for a full garden with structures, water or significant groundwork. We set out a realistic programme after the site survey so you know what to expect.
Arrange a consultation
Send a few photographs and a sentence about the site. We will reply personally.

